China Factory Network

From the drawing board to the water.

European buyers need more than attractive photos. POLARSTAR structures the factory conversation around hull work, fit-out, systems, inspection media, compliance route, and formal documents.

Request evidence pack

Production evidence

Every build begins with a clear specification.

POLARSTAR uses workshop media, model references, build questions, and inspection checkpoints to help buyers decide what needs factory confirmation before a price discussion. Formal files and compliance routes are handled through buyer due diligence rather than decorative certificate graphics.

Metal preparation and fabrication reference
2022shipbuilding program launched

Program history is reviewed with buyers as part of model selection, build planning, and due diligence.

10,000 m2factory area available for review

Workshop review can cover panel processing, hull fabrication, external outfitting, internal outfitting, and final assembly areas.

50 boatsannual capacity for verification

Annual capacity is confirmed with the production team alongside the buyer's model, fit-out level, and inspection expectations.

50+skilled workers for review

Buyer review can cover the teams behind hull fabrication, outfitting, painting, polishing, and delivery preparation.

Production areas

Hull, fit-out and integrated systems.

Hull Fabrication reference visual

Hull Fabrication

Welding and metalwork visuals support the hull-fabrication story with a clearer production context.

Metal Preparation reference visual

Metal Preparation

Factory review should cover cutting, bending, preparation, assembly flow, and the inspection photos available during the build.

Model Review reference visual

Model Review

Buyer discussions connect drawings, model selection, specification options, sea-use assumptions, and formal quality files.

Systems And Autonomy reference visual

Systems And Autonomy

USV and remote-operation projects should be discussed through sensors, communications, mission payloads, and operating-risk checks.

Qualification and official checks

Documentation for your destination.

POLARSTAR can prepare formal document packs during due diligence: company file, factory file, quality documents, export paperwork, compliance-route notes, and handover material. Sensitive numbers are not published on the website.

UK company file on request

POLARSTAR business file

POLARSTAR can provide current company documentation during buyer due diligence, with sensitive file details shared privately.

Companies House
RCR / UKCA check

UK recreational craft route

For craft placed on the UK market, the buyer pack should check the Recreational Craft Regulations 2017 route, declaration of conformity, technical file, builder's plate, manual, and marking assumptions.

GOV.UK guidance
RCD / CE check

EU recreational craft route

For Italy and Spain, recreational craft should be reviewed against the EU Recreational Craft Directive route, including CE marking and applicable harmonised-standard assumptions.

European Commission
MCA / local flag review

Commercial and passenger use

Passenger, workboat, charter, or other commercial uses should be checked against MCA small craft guidance or the destination authority before final quotation.

MCA small craft codes

Plan your build

Know what to agree at every stage.

Explore the build journey →